Indian Creek Station Rehabilitation

Indian Creek Pedestrian Bridge Image description: The image above shows the new pedestrian bridge leading to Indian Creek station. The sun sets over partially cloudy skies in the background.

Current Status

Construction on the west plaza begins Monday, Nov. 23, 2026. Estimated completion is late March 2027.

RIDER ALERT: 

IC_West Plaza_Renovation_ Website Update Graphic 

Beginning Monday, Nov. 23, 2026, the west plaza at Indian Creek Station will close for the final phase of renovations. Rail and bus service will continue as scheduled.

Temporary pedestrian detours will be in place for station access. Customers should follow posted signs for station access. 

  • Station access: The west plaza will be closed throughout construction for safety. Customers who park at Indian Creek must use the east entrance near the bus loop to enter the station. 
  • ADA access: ADA parking spaces near the Kiss & Ride area will be temporarily relocated to the east side of the parking lot to provide customers with the shortest accessible path during construction. 
  • Bridge access: The pedestrian bridge to Durham Park Road will remain open. The west faregates will only be accessible from the pedestrian bridge. There will be no access to the parking lot from the west faregates. 
  • Parking: Portions of the west parking lot may be restricted to help direct customers toward the designated pedestrian detour.

Overview

MARTA renovated Indian Creek Station as a part of its State of Good Repair program. One of the key project features includes a newly opened pedestrian bridge which connects residents on Durham Park Road to the north side of the station. For residents in surrounding neighborhoods, this bridge is transformational. The new bridge significantly reduces travel time, provides a safe, accessible route into the station, and makes using transit more convenient. 

The additional upgrades below are designed to make the station cleaner, safer, and more accessible for those who ride every day. 

Key Project Features    

  • A new pedestrian bridge for access from Durham Park Road  
  • New wall paneling, metal doors, and door frames 
  • New lighting and illuminated signage at the platform, plaza, and concourse levels
  • New landscaping, trash receptacles, and benches 
  • Pressure cleaning throughout the station 
  • Repairing and refinishing the existing wood barrel ceiling 
  • New concrete at the platform, plaza, and concourse levels 
  • New operator booth and restroom on the platform level  
  • New paving of the parking lot and bus loop, and redesigning for better traffic flow  
  • New copper gutter system 
  • New roof and wall paneling on the Police Precinct and the Traction Power Substation (TPSS) Building  
  • Repair of the windscreens at the platform level 

Concourse_Before and After

Image Description: The before-and-after comparison image above shows the concourse level of Indian Creek Station. The top image, labeled “Before,” displays an open walkway with teal tile walls and exposed wood ceiling above. The bottom image, labeled “After,” shows the renovated concourse featuring bright orange paneling, new, brighter, overhead lighting, freshly cleaned ceilings, and updated finishes along the walkway.

TPSS_Before and After Image Description: The image above displays a before and after comparison of MARTA’s Indian Creek Station Traction Power Substation. The “Before” image shows the original teal colored tiled building, while the “After” image shows the renovated structure featuring bright orange panels, new lighting, updated fencing, and fresh landscaping. 

IC West Plaza_Graphics_1st_round_Photo Image Description: This image shows an aerial view of Indian Creek Station's plaza during the pedestrian bridge opening with attendees gathered near the station entrance. The new bridge and a portion of the new plaza are visible in the background. The remaining portion of the plaza will begin renovation in November 2026. 

Stay Informed

Sign up for email updates!   

Contact

Please submit comments regarding the project
via mail or email to:   
Anna Bartee 
Project Manager II