Indian Creek Station Rehabilitation

Indian Creek Pedestrian Bridgev2 Image description: The image above shows the new pedestrian bridge leading to Indian Creek station. The sun sets over partially cloudy skies in the background.

Current Status

Construction on the west plaza begins Monday, December 7, 2026. Impact expected to last approximately four months. 

Indian Creek West Plaza Closure Dec. 7 Delay

Image Description: The image above is a map of Indian Creek Station with illustrations showing the pedestrian detours that will begin Dec. 7, 2026. All customers approaching from the parking lot must use the east faregates by the bus loop.

RIDER ALERT!

Indian Creek Station’s west plaza renovation has been delayed and construction is now scheduled to begin on Monday, Dec. 7, 2026. We apologize for any inconvenience and appreciate your patience as MARTA prepares to begin the final phase of improvements to the station's plaza.   

As a reminder, the following impacts will be in place during construction:  

  • Station access: The west plaza will be closed throughout construction for safety. Customers who park at Indian Creek must use the east entrance near the bus loop to enter the station.  

  • ADA access: ADA parking spaces near the Kiss & Ride area will be temporarily relocated to the east side of the parking lot to provide customers with the shortest accessible path during construction.  
  • Bridge access: The pedestrian bridge to Durham Park Road will remain open. The west faregates will only be accessible from the pedestrian bridge. During construction, there will be no access to the parking lot from the west faregates.  
  • Parking: Portions of the west parking lot may be restricted to help direct customers toward the designated pedestrian detour.  
  • Signage: Directional signage will be installed throughout the area.  

    Overview

    MARTA renovated Indian Creek Station as a part of its State of Good Repair program. One of the key project features includes a newly opened pedestrian bridge which connects residents on Durham Park Road to the north side of the station. For residents in surrounding neighborhoods, this bridge is transformational. The new bridge significantly reduces travel time, provides a safe, accessible route into the station, and makes using transit more convenient. 

    The additional upgrades below are designed to make the station cleaner, safer, and more accessible for those who ride every day. 

    Key Project Features    

    • A new pedestrian bridge for access from Durham Park Road  
    • New wall paneling, metal doors, and door frames 
    • New lighting and illuminated signage at the platform, plaza, and concourse levels
    • New landscaping, trash receptacles, and benches 
    • Pressure cleaning throughout the station 
    • Repairing and refinishing the existing wood barrel ceiling 
    • New concrete at the platform, plaza, and concourse levels 
    • New operator booth and restroom on the platform level  
    • New paving of the parking lot and bus loop, and redesigning for better traffic flow  
    • New copper gutter system 
    • New roof and wall paneling on the Police Precinct and the Traction Power Substation (TPSS) Building  
    • Repair of the windscreens at the platform level 

    Concourse_Before and After

    Image Description: The before-and-after comparison image above shows the concourse level of Indian Creek Station. The top image, labeled “Before,” displays an open walkway with teal tile walls and exposed wood ceiling above. The bottom image, labeled “After,” shows the renovated concourse featuring bright orange paneling, new, brighter, overhead lighting, freshly cleaned ceilings, and updated finishes along the walkway.

    TPSS_Before and After Image Description: The image above displays a before and after comparison of MARTA’s Indian Creek Station Traction Power Substation. The “Before” image shows the original teal colored tiled building, while the “After” image shows the renovated structure featuring bright orange panels, new lighting, updated fencing, and fresh landscaping. 

    IC West Plaza_Graphics_1st_round_Photo Image Description: This image shows an aerial view of Indian Creek Station's plaza during the pedestrian bridge opening with attendees gathered near the station entrance. The new bridge and a portion of the new plaza are visible in the background. The remaining portion of the plaza will begin renovation in November 2026. 